As part of a multi-family development, Clark Builders integrated three fully prefabricated elevator shafts into the project using our FW Series TILT Panels. Each shaft was designed and assembled offsite, then craned into place in a single day using an 80-tonne crane.
Project Highlights
- Offsite Fabrication: All three elevator shafts were fully constructed offsite for quality control and schedule efficiency.
- Single-Day Installation: Completed in one day, drastically reducing site disruption and construction sequencing delays.
- Safety and Efficiency Gains: Minimized manhours working at heights, reduced on-site traffic, and improved overall site safety.
- FW Series TILT Panels: Fire-rated, structurally engineered components delivered code compliance and durability in a modular format.
This solution demonstrates how prefabrication can streamline complex structural elements while improving safety, speed, and coordination on large-scale construction projects.